澳门皇冠官网-澳门皇冠注册官方网站

澳门皇冠官网-澳门皇冠注册官方网站

Location: Home > Core Business > Overseas Business
Third Karnaphuli Bridge, Bangladesh
Source:MBEC Date:2019年03月15日

Anthem of CREC—“Trailbreaker”

This bridge locates in Chittagong in the southeast of Bangladesh, it is the first cable-stayed road bridge in Bangladesh. It has a total length of 950m and the main bridge is a four-pylon extradosed bridge of pre-stressed continuous concrete girder with a main span of 200m carrying six carriageways in dual directions. The bridge deck is 25m wide. The bridge was commenced in July 2006 and completed in April 2011. MBEC designed and constructed the bridge.

Third Karnaphuli Bridge

 

Print Close

新濠天地 真人娱乐app 万博体育manbetx3.0 美高梅手机网投 美高梅游戏(唯一)官方网站 亚洲城Lingshi888

Contact US

Address: China Railway Plaza, No.69 Fuxing Road, Haidian District, Beijing, P.R. China

Post Code: 100039E-mail: crecwebmaster@163.com

Fax: +86-010-51877688Web: /english/1990/index.html

@ 1999-2019 CREC All Rights Reserved

XML 地图 | Sitemap 地图
新濠天地 真人娱乐app 万博体育manbetx3.0 美高梅手机网投 美高梅游戏(唯一)官方网站 亚洲城Lingshi888