澳门皇冠官网-澳门皇冠注册官方网站

澳门皇冠官网-澳门皇冠注册官方网站

Location: Home > Core Business > Overseas Business
Nabouwalu Road Upgrade Project, Fiji
Source:China Railway First Group Date:2019年03月18日

Project name: Nabouwalu Road Upgrade Project, Fiji

Total length: 70 kilometers

Contractor: China Railway First Group Co.,Ltd.

The project located in the second largest island of Fiji. The Nabouwalu Road is the only traffic line connecting the Nabouwalu Port of Fiji North Island and the strategic town of the east, Lebsasa. The whole length of the road is 70km, and the contract amount is 837 million RMB sourcing from concessional loan of Chinese government. It is also the biggest the road upgrade project in Fiji.

Source: www.cctv.com

The Nabouwalu Road Upgrade Project was completed in 2016 and was awarded the “National Excellent Engineering” in 2017.

Fiji Nabouwalu Road Upgrade Project 


Since the commencement, the CRFG well planned and organized, overcame all difficulties, and completed construction mission advance 26 days of the contract duration successfully.


The upgraded road reduces travel time from Lebsasa to the Port from 5 hours to 2 hours. It is much easier for the trade and travel of residents in the North Island. The road plays the positive role for promoting the North Island’s even Fiji’s economic development and living standard of people. 

 

Print Close

新濠天地 真人娱乐app 万博体育manbetx3.0 美高梅手机网投 美高梅游戏(唯一)官方网站 亚洲城Lingshi888

HomeAbout UsNews CenterCore BusinessSustainable DevelopmentInvestor RelationsCorporate CultureThe Belt and Road

Address: Buliding NO.9 Fuxing Road 69 Haidian District Beijing China

@ 1999-2019 CREC All Rights Reserved

XML 地图 | Sitemap 地图
新濠天地 真人娱乐app 万博体育manbetx3.0 美高梅手机网投 美高梅游戏(唯一)官方网站 亚洲城Lingshi888