澳门皇冠官网-澳门皇冠注册官方网站

澳门皇冠官网-澳门皇冠注册官方网站

JQDS900 Tunnel Bridging Machine
Source:CREC Date:2018年11月29日

JQDS900 Tunnel Bridging Machine could work together with the supporting low-post beam truck to transport and erect box girder of high-speed railway. The parallel operation mode of bridging machine and girder-transporting vehicle is adopted. After the beam is loaded in precast yard, it will be transported to the tail of the bridge machine through the access road, roadbed, bridge and culvert, and then bridging machine will erect box girders.

JQDS900 Tunnel Bridging Machine

 

Print Close

新濠天地 真人娱乐app 万博体育manbetx3.0 美高梅手机网投 美高梅游戏(唯一)官方网站 亚洲城Lingshi888

HomeAbout UsNews CenterCore BusinessSustainable DevelopmentInvestor RelationsCorporate CultureThe Belt and Road

Address: Buliding NO.9 Fuxing Road 69 Haidian District Beijing China

@ 1999-2019 CREC All Rights Reserved

XML 地图 | Sitemap 地图
新濠天地 真人娱乐app 万博体育manbetx3.0 美高梅手机网投 美高梅游戏(唯一)官方网站 亚洲城Lingshi888