澳门皇冠官网-澳门皇冠注册官方网站

澳门皇冠官网-澳门皇冠注册官方网站

Fast Track Project from Jingguang Road to Shakou Road in Zhengzhou City
Source:CREC Date:2018年11月28日

With a total length of 25.2 kilometers, the project runs through Zhengzhou City, starting from the southwest expressway in the south and ending in Lianhuo Expressway in the north. Started at the end of 2010 and opened to traffic at the end of 2011, it is located at the downtown area of Zhengzhou, which is also the first municipal bridge project with great construction difficulty in the Central Plains. Its two main piers near the railway have a diameter of 2.2 meters and a depth of 70 meters. It was highly appraised by the government and railway bureau of Zhengzhou City.

Fast Track Project from Jingguang Road to Shakou Road in Zhengzhou City

 

Print Close

新濠天地 真人娱乐app 万博体育manbetx3.0 美高梅手机网投 美高梅游戏(唯一)官方网站 亚洲城Lingshi888

HomeAbout UsNews CenterCore BusinessSustainable DevelopmentInvestor RelationsCorporate CultureThe Belt and Road

Address: Buliding NO.9 Fuxing Road 69 Haidian District Beijing China

@ 1999-2019 CREC All Rights Reserved

XML 地图 | Sitemap 地图
新濠天地 真人娱乐app 万博体育manbetx3.0 美高梅手机网投 美高梅游戏(唯一)官方网站 亚洲城Lingshi888